Welcome to Wuxi R-Norway Technology CO.,LTD!
无锡市瑞诺威科技有限公司

Wuxi R-Norway Technology CO.,LTD

+86-15895351298 +86-13861853661

RNW-2000S

    Equipment principle: After the sewage is pumped into the sewage conditioning tank of the sewage treatment equipment, add the A agent for stirring reaction, and then add the B agent after a full reaction for 10 minutes. The reaction will reach the requirements before the filtration, and the PH value will reach neutral. Add the C agent for decolorization aid filter. Then feed the material through a pneumatic diaphragm pump, drive it into the filter press for solid-liquid separation, and discharge the cean water inside.
Product details

Scope of application

The equipment is widely used in various sewage treatment such as grinding, polishing, priting and dyeing, printing, painting, spraying, coating, breeding, etc.

Equipment principle

After the sewage is pumped into the sewage conditioning tank of the sewage treatment equipment, add the A agent for stirring reaction, and then add the B agent after a full reaction for 10 minutes. The reaction will reach the requirements before the filtration, and the PH value will reach neutral. Add the C agent for decolorization aid filter. Then feed the material through a pneumatic diaphragm pump, drive it into the filter press for solid-liquid separation, and discharge the cean water inside.

Integrated equipment process flow chart

TOP

Online Service
WeChat
chat
Quotation
Solution
Hotline
Hotline

+86-15895351298